RightSite Research · July 2026

The Megawatt Wall: How the Utility Bill, Not the Truck, Decides Whether Electric Freight Beats Diesel

Electric trucks are supposed to be cheaper to run than diesel. But whether that's true at a given charging site depends less on the truck and more on which utility it plugs into, and across the country that changes everything. Pricing 241 U.S. commercial electricity tariffs on the rate a megawatt truck charger actually pays, this study finds that the same fee that haunts passenger fast charging, the demand charge, can make electric freight cost more per mile than diesel, before the truck even moves.

Key findings

  • At the near-empty utilization of a brand-new megawatt corridor site (a 3% load factor), the typical territory's electricity works out to 101 cents per mile, more than diesel's 89 cents, and beats diesel on fuel in only a minority of places. Electric loses in 59% of territories, before any margin. The truck's energy would undercut diesel easily at an average price; the demand charge, spread over a nearly empty connection, is what flips it.
  • The result doesn't hinge on today's fuel price. Diesel would have to reach $6.06 a gallon, above even today's near-record $5.31, before the typical early-corridor site beats it on fuel. Anchoring on a high diesel price is deliberately conservative; a cheaper, more normal price only widens the gap.
  • The fix is not a cheaper truck. It is control over the peak. A depot that spreads charging across the overnight window beats diesel in 99% of territories (about 31 cents per mile). The same physics that makes the corridor wall steep makes depot load-management hugely valuable.
  • Subsidies barely move a corridor site, because the binding cost is the recurring demand charge, not the hardware. Permanent demand-relief and no-demand commercial EV rates do far more, dollar for dollar.
  • A battery or power cap can climb the wall, but only by deploying multi-megawatt-hour capital, or slowing an 8-minute charge to 30 minutes, purely to dodge a billing artifact. That capital fighting the tariff is the rate-design failure this paper identifies.
Why it matters: the first years of electric freight will be decided less by battery and truck cost, which are falling, than by two things within policy's reach: how utilities charge megawatt loads for peak power, and whether that power can be scheduled. Corridor siting is a rate-map problem, not just a traffic-map problem.

Read the paper

Open PDF ↗ Download

If the viewer doesn't load on your device, open the PDF directly. It is free to read and share.

The Megawatt Wall: Utility Demand Charges and the Cost of Electric Freight Relative to Diesel Across United States Utility Territories

A demand-aware pricing analysis of 241 U.S. commercial electricity tariffs, the actual rates a megawatt truck-charging site is billed on, measuring, in cents per mile, when electric freight beats diesel and when the demand charge flips it.

Reproducibility

Code and a public data sample (39 encoded rate schedules) are openly available and reproduce the paper's results. The same repository and engine serve both this paper and its passenger companion, The Rate Wall:

GitHub: rightsitera-arch/rate-wall-reproducibility

Archived at Zenodo (DOI: 10.5281/zenodo.21667465), activates on release

License: code MIT; data sample CC BY 4.0

How to cite

Lightfoot, J. (2026). The Megawatt Wall: Utility Demand Charges and the Cost of Electric Freight Relative to Diesel Across United States Utility Territories (RightSite Working Paper). https://github.com/rightsitera-arch/rate-wall-reproducibility

Transparency

The author operates RightSite, which uses the tariff library and pricing method described here; this competing interest is disclosed in full in the paper. The full 241-schedule library is proprietary, but every underlying tariff is a public utility document, and the released engine plus sample let anyone reproduce the method.

© 2026 RightSite Research Working paper. Comments welcome